Weekiwachee Preserve feasibility study released - Hernando Sun

2022-09-25 11:00:54 By : Ms. Lucky Chen

Taking care of feet in need

Theresa Eaton: Defying the Odds

Free Masons plan open house and craft show

Program aims to school students and parents about drug disposal

Coors Beer Spill Closes I-75

The long awaited feasibility study for recreational uses of the Weekiwachee Preserve has been completed. The study determined that recreational features and facilities are possible, and an initial cost estimate has been provided by Fender Marine Construction, Inc. for $808,898, which includes initial design, 56 feet of prefabricated footbridge, three 10’ x 12’ picnic shelters, five 15’ x 27’ picnic pavilions with concrete floors, and a prefabricated ‘EZ Dock’ kayak launch.

The feasibility study was approved in February 2022 and cost $65,000, funded by park impact fees.

The proposed project is called the Shoal Line Boulevard Recreation Area and has seen many variations throughout the years.

Two public information meetings were held on May 25 and June 21, 2022. With the release of the study, a “Town Hall” area of the Hernando County website was opened for public comment. The majority of the 218 comments that were collected online oppose the recreational development of the preserve.

The common theme of the comments are — that by its very name, the Weekiwachee Preserve is not to be frequented by humans and their sporting equipment.

Included with the Feasibility Study, is a 1997 Southwest Florida Water Management District (SWFWMD) Preserve Management Plan that shows recreational use of the area has previously been considered. “It is the policy of the District (Board Policy 610-3) that appropriate public recreational usage of District lands be permitted, provided that the usage is compatible with water resource management and protection needs,” states the 1997 plan. The plan also states, “Permitted recreational uses of the Preserve will include hiking, bicycling, fishing, swimming, picnicking, birdwatching, nature interpretation, canoeing, and boating use by small craft that lack internal combustion engines. The preserve will also be made available for environmental education.”

According to the study, approximately 60 acres of the 7000+ Weekiwachee Preserve, or less than 1 percent will be improved. Development will be split into two phases, the first being the creation of a beach area with a designated picnic spot and swimming area along the northernmost lake. This area will also be used for fishing, and kayaking. A composite boardwalk will extend from the parking area, southward to the beach area, and throughout greenspace east.

The second phase will include improvements to existing pathways, and new paths constructed around natural areas. The goal is to invite “passive recreation opportunities.” No cost estimate was available for this phase.

The Hernando Sun is a locally owned weekly newspaper. The founders of the newspaper are Rocco and Julie Maglio. They saw the need for a newspaper when the Hernando Today newspaper closed their doors in 2014. Rocco is from Hernando, he went to school from Moton Elementary through Hernando High. Growing up in Hernando enhances his ability to provide background to ongoing issues. The Hernando Sun Printed their first issue in March 2015. They published monthly for a year before increasing to a weekly printing. The newspaper is delivered through the US mail, so it arrives with your mail.

USPS PERIODICALS PERMIT AS REQUIRED FOR PUBLIC NOTICES PER SECTION 50.011(1)(e), F.S. STATEMENT OF OWNERSHIP USPS PERIODICAL PERMIT NUMBER 16590 Periodicals Permit Verification

We'd love your feedback on our new site!